Construction Draw Inspection
Percent-complete verification for construction lenders.
At a glance
- Base price
- $375 per property
- Typical time on site
- 1 – 3 hours per draw
- Governing standard
- Lender-specific draw protocols, AIA G702/G703
- Inspection scopes
- 1 scope · 5 checkpoints
- Category
- Insurance, Lender & Compliance
What this inspection covers
Periodic verification of work in place against the approved budget and schedule of values, so the lender can release funds proportional to actual progress. Includes lien waiver and stored materials verification.
Key inspection points
- Percent complete by schedule-of-values line
- Work in place vs requisitioned amount
- Stored materials verification
- Change order tracking
- Cost to complete and budget sufficiency
How the scope is structured
When you accept the proposal, these scopes flow into your project automatically. Each engineer works and signs off one scope at a time, and every checkpoint below becomes a recorded finding with a condition, a severity and photographic evidence.
01
Construction Draw Inspection — Standard Scope
5 checkpoints
Construction Draw Inspection — Standard Scope
5 checkpoints
- Percent complete by schedule-of-values line
- Work in place vs requisitioned amount
- Stored materials verification
- Change order tracking
- Cost to complete and budget sufficiency
Request a Construction Draw Inspection
Send us the address and the question you need answered. An estimator replies with a proposal that names each scope, the standard it follows, what you receive and when — normally by the end of the next business day.
- Priced line by line
- Nothing to sign until you accept
- A named estimator, not a bot