Mid-Rise Building Inspection
Four to twelve storey residential or mixed-use building assessment.
At a glance
- Base price
- $5,500 per property
- Typical time on site
- 2 – 4 days
- Governing standard
- ASTM E2018-15 + IBC occupancy requirements
- Inspection scopes
- 1 scope · 6 checkpoints
- Category
- Commercial & Multi-Family
What this inspection covers
Condition assessment of mid-rise structures — typically four to twelve storeys with a single elevator bank, podium or wrap parking and Type III/V construction over a Type I podium. Focuses on envelope performance, podium waterproofing and the elevated elements that drive capital risk in this class.
Key inspection points
- Podium deck and plaza waterproofing
- Exterior cladding, sealant and window systems
- Balcony and walkway elevated elements
- Elevator equipment and controller condition
- Standpipe, sprinkler and alarm systems
- Corridor and stair pressurisation
How the scope is structured
When you accept the proposal, these scopes flow into your project automatically. Each engineer works and signs off one scope at a time, and every checkpoint below becomes a recorded finding with a condition, a severity and photographic evidence.
01
Mid-Rise Building Inspection — Standard Scope
6 checkpoints
Mid-Rise Building Inspection — Standard Scope
6 checkpoints
- Podium deck and plaza waterproofing
- Exterior cladding, sealant and window systems
- Balcony and walkway elevated elements
- Elevator equipment and controller condition
- Standpipe, sprinkler and alarm systems
- Corridor and stair pressurisation
Request a Mid-Rise Building Inspection
Send us the address and the question you need answered. An estimator replies with a proposal that names each scope, the standard it follows, what you receive and when — normally by the end of the next business day.
- Priced line by line
- Nothing to sign until you accept
- A named estimator, not a bot