Phase / Progress Inspection

Staged inspections during construction — footing, pre-drywall and final.

At a glance

Base price
$325 per hour
Typical time on site
1.5 – 2 hours per phase
Governing standard
IRC / IBC + approved construction documents
Inspection scopes
1 scope · 4 checkpoints
Category
Residential Inspections

What this inspection covers

A sequence of inspections performed at critical construction milestones while work remains visible. Typically three to five phases: footing and foundation, framing, rough-in mechanical/electrical/plumbing, pre-drywall, and final.

Key inspection points

  • Footing, foundation and waterproofing
  • Framing, connectors, shear and load paths
  • Rough-in MEP prior to concealment
  • Insulation, air sealing and vapour control

How the scope is structured

When you accept the proposal, these scopes flow into your project automatically. Each engineer works and signs off one scope at a time, and every checkpoint below becomes a recorded finding with a condition, a severity and photographic evidence.

01

Phase / Progress Inspection — Standard Scope

4 checkpoints

  • Footing, foundation and waterproofing
  • Framing, connectors, shear and load paths
  • Rough-in MEP prior to concealment
  • Insulation, air sealing and vapour control

Request a Phase / Progress Inspection

Send us the address and the question you need answered. An estimator replies with a proposal that names each scope, the standard it follows, what you receive and when — normally by the end of the next business day.

  • Priced line by line
  • Nothing to sign until you accept
  • A named estimator, not a bot