Phase / Progress Inspection
Staged inspections during construction — footing, pre-drywall and final.
At a glance
- Base price
- $325 per hour
- Typical time on site
- 1.5 – 2 hours per phase
- Governing standard
- IRC / IBC + approved construction documents
- Inspection scopes
- 1 scope · 4 checkpoints
- Category
- Residential Inspections
What this inspection covers
A sequence of inspections performed at critical construction milestones while work remains visible. Typically three to five phases: footing and foundation, framing, rough-in mechanical/electrical/plumbing, pre-drywall, and final.
Key inspection points
- Footing, foundation and waterproofing
- Framing, connectors, shear and load paths
- Rough-in MEP prior to concealment
- Insulation, air sealing and vapour control
How the scope is structured
When you accept the proposal, these scopes flow into your project automatically. Each engineer works and signs off one scope at a time, and every checkpoint below becomes a recorded finding with a condition, a severity and photographic evidence.
01
Phase / Progress Inspection — Standard Scope
4 checkpoints
Phase / Progress Inspection — Standard Scope
4 checkpoints
- Footing, foundation and waterproofing
- Framing, connectors, shear and load paths
- Rough-in MEP prior to concealment
- Insulation, air sealing and vapour control
Request a Phase / Progress Inspection
Send us the address and the question you need answered. An estimator replies with a proposal that names each scope, the standard it follows, what you receive and when — normally by the end of the next business day.
- Priced line by line
- Nothing to sign until you accept
- A named estimator, not a bot